Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS SDD Tooling BTG Data Type Comparison Iterations"

(Information)
Line 28: Line 28:
  
 
29 Rules
 
29 Rules
 +
<br>
 
43.5 Person Days
 
43.5 Person Days
 +
<br>
 
Start Date 7/31/2008
 
Start Date 7/31/2008
 +
<br>
 
End Date 9/17/2008
 
End Date 9/17/2008
 
  
 
{| border=1
 
{| border=1
Line 99: Line 101:
 
==Iteration 2==
 
==Iteration 2==
 
7 Rules
 
7 Rules
 +
<br>
 
10.5 Person Days
 
10.5 Person Days
 +
<br>
 
Start Date 9/17/2008
 
Start Date 9/17/2008
 +
<br>
 
End Date 9/29/2008
 
End Date 9/29/2008
  
Line 126: Line 131:
 
==Iteration 3==
 
==Iteration 3==
 
9 Rules
 
9 Rules
 +
<br>
 
13.5 Person Days
 
13.5 Person Days
 +
<br>
 
Start Date 9/29/2008
 
Start Date 9/29/2008
 +
<br>
 
End Date 10/14/2008
 
End Date 10/14/2008
  
Line 156: Line 164:
 
==Iteration 4==
 
==Iteration 4==
 
7 Rules
 
7 Rules
 +
<br>
 
10.5 Person Days
 
10.5 Person Days
 +
<br>
 
Start Date 10/14/2008
 
Start Date 10/14/2008
 +
<br>
 
End Date 10/24/2008
 
End Date 10/24/2008
  
Line 182: Line 193:
 
==Iteration 5==
 
==Iteration 5==
 
8 Rules
 
8 Rules
 +
<br>
 
12 Person Days
 
12 Person Days
 +
<br>
 
Start Date 10/24/2008
 
Start Date 10/24/2008
 +
<br>
 
End Date 11/7/2008
 
End Date 11/7/2008
  
Line 210: Line 224:
 
==Iteration 6==
 
==Iteration 6==
 
11 Rules
 
11 Rules
 +
<br>
 
16.5 Person Days
 
16.5 Person Days
 +
<br>
 
Start Date 11/7/2008
 
Start Date 11/7/2008
 +
<br>
 
End Date 11/26/2008
 
End Date 11/26/2008
  

Revision as of 14:06, 30 July 2008

Information

Dates based on Josh working 75% on Aggregator and Robert working 50%
design doc = 3 days
rule functions (70 total rules) and rule test 1.5 = person day each = 105 days
Total = 108 person days
Target is 11/30

Rule Function Iterations

Green = On schedule
Yellow = Danger of missing schedule
Red = Has missed schedule
Blue = Complete


Iteration 1

29 Rules
43.5 Person Days
Start Date 7/31/2008
End Date 9/17/2008

Type Owner Comments
DisplayTextType
VersionType
UUIDType
IdentityType
ContentsType
ContentType
ContentPurposeType
PackageTypeType
PackageDescriptorType
ResultingResourceType
DeploymentDescriptorType
TopologyType
ResourceType
ResourceTypeNameType
PropertyType
VariableExpressionType
InstallableUnitType
RequirementsType
RequirementType
RequirementResourceConstraintType
VersionConstraintType
VersionRangeType
MaxVersionType
VersionValueType
VersionConstraintValueType
InstallationArtifactsType
ArtifactType
ArtifactTypeNameType
DescriptorInfoGroup

Iteration 2

7 Rules
10.5 Person Days
Start Date 9/17/2008
End Date 9/29/2008

Type Owner Comments
PropertyConstraintType
ConsumptionConstraintType
ConsumptionConstraintValueType
CapacityConstraintType
CapacityValueType
DescriptionGroup
DisplayElementGroup


Iteration 3

9 Rules
13.5 Person Days
Start Date 9/29/2008
End Date 10/14/2008

Type Owner Comments
VariablesType
ResourcePropertyType
IntegerParameterType
BaseParameterType
BaseVariableType
StringCaseType
BooleanParameterType
ParametersType
StringParameterType

Iteration 4

7 Rules
10.5 Person Days
Start Date 10/14/2008
End Date 10/24/2008

Type Owner Comments
IdentityType
FixIdentityType
PackageIdentityType
ManufacturerType
MaintenanceInformationType
LocationType
BuildInformationType

Iteration 5

8 Rules
12 Person Days
Start Date 10/24/2008
End Date 11/7/2008

Type Owner Comments
AlternativeRequirementType
AlternativeRequiredBaseConstraintType
PropertyMatchType
PropertyValueListType
OperationType
OperationListType
ResultingResourceType
ResultingPropertyType

Iteration 6

11 Rules
16.5 Person Days
Start Date 11/7/2008
End Date 11/26/2008

Type Owner Comments
RequiredBaseType
RequiredBaseConstraintType
CompletionType
ArgumentType
ArgumentListType
AdditionalContentType
SubstitutionType
SDDPackageTypeType
ExtensiblePackageTypeType
DisplayTextType
DescriptorInfoGroup

Back to the top