Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Management Enablement"

(Added action items and correct html links for weeklycandidate pages)
(Working Documents)
 
(100 intermediate revisions by the same user not shown)
Line 15: Line 15:
 
|-
 
|-
 
| Toll-free Dial-in number:   
 
| Toll-free Dial-in number:   
| 1-877-641-0660  
+
| 1-888-682-4285  
 
|-
 
|-
 
| Primary International Dial-in:
 
| Primary International Dial-in:
| + 1-919-531-0660 (Requires International prefix first)
+
| + 1-973-368-0695 (Requires International prefix first)
 
|-
 
|-
| Passcode:
+
| SAS Employees:
| 107017
+
| x40000
 +
|-
 +
| Conference Code:
 +
| 3358100246
 
|}
 
|}
  
 
== Contact ==
 
== Contact ==
Email [[mailto:Jason.Losh@sas.com|'''Jason Losh''']]
+
Email [[mailto:Jason.Losh@sas.com'''Jason Losh''']]
 
+
  
== Working Design Documents ==
+
== Agenda (1/27/09) ==
*[[COSMOS_Design_198553]], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=198553 198553: Provide an implementatin of WS Resource Catalog]
+
* 1.1 i2 status update
*[http://wiki.eclipse.org/COSMOS_SDD_Runtime_Architecture SDD runtime architecture]
+
** http://wiki.eclipse.org/COSMOS_1.1_Iteration2_Features
 +
** Preliminary design discussions
 +
** Profile and profile module discussion
 +
* BTG status
 +
** CL2 rules in the open
 +
* Around the room
  
 +
== Agenda (1/13/09) ==
 +
* Welcome Joe
 +
* 1.1 i1 closure
 +
** Build status
 +
** Build declared unstable due to a couple of non-ME bugs
 +
* 1.1 i2 plans
 +
** ERs for i2 entered -- owners for each should be on the architecture call Wednesday morning to discuss
 +
** Any warranting discussion today?
 +
** http://wiki.eclipse.org/COSMOS_1.1_Iteration2_Features
 +
* BTG status
 +
** Are we "done done" with the BTG for CL1 - have a potential adopter
 +
* Profile and profile module discussion
 +
* Around the room
  
== Agenda (6/10/08) ==
+
== Agenda (1/6/09) ==
 +
* 1.1 i1 status
 +
* Change analyzer update
 +
** Brad checked the code in prior to the Holidays!
 +
* Rules status
 +
** Update on TPTP tests
 +
* Profile module implementation plans
 +
* Around the room
  
# Follow-up on action items
 
#* Jason to commit SAS zip extractor code, Mark to change packages to align with COSMOS requirements.
 
#* Continue work on SDD for COSMOS.
 
#* Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
 
#* Eric to enter any additional Tooling ERs for i11.
 
#* Charlie to set up another meeting with P2 Equinox team.
 
#* SDD User Guide?
 
#* Discuss Runtime design documentation.
 
  
== Agenda (6/3/08) ==
 
# i11 status updates
 
#* This should be in prep for the community call meeting on Wednesday morning.  The following page will be reviewed [http://wiki.eclipse.org/COSMOS/COSMOS_i11_week5_weeklycandidate] [http://wiki.eclipse.org/COSMOS/COSMOS_i11_week5_no2_weeklycandidate] Note that the week5 page has not been created as of the time the agenda was created (5/30).  It will be created prior to the ME meeting on 6/3.
 
# Follow-up on action items
 
#* My update is that I'm continuing to refine the SDD for COSMOS.  Also, I was about to commit the SAS source code but noted an Eclipse process related to internal/provisional APIs that I did not expect.  Mark M. and I have been reviewing and think all of our APIs should be provisional at this point.  This will cause some refactor in package names.
 
#Runtime architecture discussion based on Julia's feedback
 
#* [[Media:Comments_on_COSMOS_SDD_Runtime_Architecture.zip]]
 
  
Time permitting … alignment/integration topics
+
== Working Documents ==
 +
*[[COSMOS_Design_198553]], [https://bugs.eclipse.org/bugs/show_bug.cgi?id=198553 198553: Provide an implementation of WS Resource Catalog]
 +
*[http://wiki.eclipse.org/COSMOS_SDD_Runtime_Architecture SDD Runtime Architecture 1.0 (updated)]
 +
*[[P2 Install Example]]
 +
*[[SDD Runtime Design Discussion Artifacts]]
 +
*[http://wiki.eclipse.org/Image:Sdd_implementation.zip SDD Implementation Slides]
  
#P2/SDD runtime alignment
+
== 2009 Minutes of prior meetings ==
#*Charlie to provide an update on scheduling a meeting to discuss P2/SDD again
+
* [[COSMOS_ME_Minutes_06JAN09|January 6, 2009]]
#SML/CML/SDD/OVF alignment
+
#*Pending discussion between Mark W. and Jason.  No update yet.
+
#CMDBf integration
+
#*Tee this as a future discussion item as well.  May not be covered in this call.
+
  
== Minutes of prior meetings ==
+
== 2008 Minutes of prior meetings ==
* [[COSMOS_SDD_Minutes_03JUN08|June 3, 2008]]
+
* [[COSMOS_ME_Minutes_25NOV08|November 25, 2008]]
* [[COSMOS_SDD_Minutes_27MAY08|May 27, 2008]]
+
* [[COSMOS_ME_Minutes_18NOV08|November 18, 2008]]
 +
* [[COSMOS_ME_Minutes_04NOV08|November 4, 2008]]
 +
* [[COSMOS_ME_Minutes_28OCT08|October 28, 2008]]
 +
* [[COSMOS_ME_Minutes_23OCT08_Change_Analyzer_Status|October 23, 2008 Change Analyzer Status Update Call]]
 +
* [[COSMOS_ME_Minutes_21OCT08|October 21, 2008]]
 +
* [[COSMOS_ME_Minutes_30SEP08|September 30, 2008]]
 +
* [[COSMOS_ME_Minutes_09SEP08|September 9, 2008]]
 +
* [[COSMOS_ME_Minutes_02SEP08|September 2, 2008]]
 +
* [[COSMOS_ME_Minutes_19AUG08|August 19, 2008]]
 +
* [[COSMOS_ME_Minutes_29JUL08|July 29, 2008]]
 +
* [[COSMOS_ME_Minutes_22JUL08|July 22, 2008]]
 +
* [[COSMOS_ME_Minutes_15JUL08|July 15, 2008]]
 +
* [[COSMOS_ME_Minutes_08JUL08|July 08, 2008]]
 +
* [[COSMOS_ME_Minutes_24JUN08|June 24, 2008]]
 +
* [[COSMOS_ME_Minutes_17JUN08|June 17, 2008]]
 +
* [[COSMOS_ME_Minutes_10JUN08|June 10, 2008]]
 +
* [[COSMOS_ME_Minutes_03JUN08|June 3, 2008]]
 +
* [[COSMOS_ME_Minutes_27MAY08|May 27, 2008]]
 
* [[COSMOS_SDD_Minutes_22MAY08|May 22, 2008]]
 
* [[COSMOS_SDD_Minutes_22MAY08|May 22, 2008]]
 
* [[COSMOS_SDD_Minutes_15MAY08|May 15, 2008]]
 
* [[COSMOS_SDD_Minutes_15MAY08|May 15, 2008]]
Line 89: Line 119:
 
* [[COSMOS_SDD_Minutes_08JAN08|January 8, 2008]]
 
* [[COSMOS_SDD_Minutes_08JAN08|January 8, 2008]]
  
[[Category:SDD Tooling]]
+
[[Category:SDD Tooling]][[Category:COSMOS Standing Meetings]][[Category: SDD Runtime]]

Latest revision as of 18:54, 5 March 2009

COSMOS Main Page


Management Enablement

Meeting Title: COSMOS Management Enablement Weekly Meeting
Link to information on Wiki:
Date & Time: Tuesday at 11:00 EDT / 11:00am EDT
Toll-free Dial-in number: 1-888-682-4285
Primary International Dial-in: + 1-973-368-0695 (Requires International prefix first)
SAS Employees: x40000
Conference Code: 3358100246

Contact

Email [Jason Losh]

Agenda (1/27/09)

Agenda (1/13/09)

  • Welcome Joe
  • 1.1 i1 closure
    • Build status
    • Build declared unstable due to a couple of non-ME bugs
  • 1.1 i2 plans
  • BTG status
    • Are we "done done" with the BTG for CL1 - have a potential adopter
  • Profile and profile module discussion
  • Around the room

Agenda (1/6/09)

  • 1.1 i1 status
  • Change analyzer update
    • Brad checked the code in prior to the Holidays!
  • Rules status
    • Update on TPTP tests
  • Profile module implementation plans
  • Around the room


Working Documents

2009 Minutes of prior meetings

2008 Minutes of prior meetings

Back to the top