Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "Swordfish Documentation: Sprint Plan"
Line 6: | Line 6: | ||
Update 27.03.2009: Merged sprints 4 and 5: | Update 27.03.2009: Merged sprints 4 and 5: | ||
− | * Fr. 03.04: Sprint 3 Demo, Retrospective + Feature Estimates | + | * Fr. 03.04: Sprint 3 Demo, Retrospective + Feature Estimates+ Planning for Toolsuite |
− | * Mo. 06.04: Sprint 4 Planung | + | * Mo. 06.04: Sprint 4 Planung for Runtime |
* Tue. 07.04 until incl. Mi. 29.04: Sprint 4 development | * Tue. 07.04 until incl. Mi. 29.04: Sprint 4 development | ||
+ | * 31.04 Sprint 4 Review, Retrospective + Feature Estimates + Panning for Toolsuite | ||
* Mo. 20.04: Checkpoint: All mandatory M7 requirements fulfilled? | * Mo. 20.04: Checkpoint: All mandatory M7 requirements fulfilled? | ||
* Thu. 30.04: Sprint 4 Demo | * Thu. 30.04: Sprint 4 Demo |
Revision as of 15:26, 29 March 2009
{{#eclipseproject:rt.swordfish}}
Swordfish Sprints for Galileo
Update 27.03.2009: Merged sprints 4 and 5:
- Fr. 03.04: Sprint 3 Demo, Retrospective + Feature Estimates+ Planning for Toolsuite
- Mo. 06.04: Sprint 4 Planung for Runtime
- Tue. 07.04 until incl. Mi. 29.04: Sprint 4 development
- 31.04 Sprint 4 Review, Retrospective + Feature Estimates + Panning for Toolsuite
- Mo. 20.04: Checkpoint: All mandatory M7 requirements fulfilled?
- Thu. 30.04: Sprint 4 Demo
Swordfish is developed using the scrum method. For the Galileo release the following sprints have been scheduled in synchronization with the Galileo Milestones for the Swordfish project. The Features and Tasks for Each sprint can be accessed through the links below:
sprint1: 09.02.2009 – 05.03.2009
sprint2: 06.03.2009 – 18.03.2009 (M6)
sprint3: 19.03.2009 – 02.04.2009
sprint4: 03.04.2009 – 16.04.2009
sprint5: 17.04.2009 – 06.05.2009 (M7)
sprint6: 07.05.2009 – 20.05.2009 (RC1)
Release: 21.05.2009 – 17.06.2009 (Endgame)