Difference between revisions of "COSMOS 1.2 Iteration3 Features"

(New page: = COSMOS v1.2 iteration 3 plan = == Schedule for Iteration 3 == Cosmos_Release_Plan ==Design doc every enhancement== * if the enhancement is really small, put in at least a paragraph...)
 
(Bugzillas for this iteration)
Line 64: Line 64:
 
<td><b>Not started</b></td>
 
<td><b>Not started</b></td>
 
<td>ME</td>
 
<td>ME</td>
<td></td>
+
<td>[https://bugs.eclipse.org/bugs/show_bug.cgi?id=299382 299382]</td>
 
<td>Enhancement</td>
 
<td>Enhancement</td>
 
<td>Implement simple registry to store resulting resource/change information</td>
 
<td>Implement simple registry to store resulting resource/change information</td>
Line 70: Line 70:
 
<td>Josh Hester</td>
 
<td>Josh Hester</td>
 
<td>High</td>
 
<td>High</td>
<td></td>
+
<td>[http://wiki.eclipse.org/COSMOS_Design_299382 299382]</td>
 
<td></td>
 
<td></td>
 
         <tr>
 
         <tr>

Revision as of 06:24, 12 January 2010

COSMOS v1.2 iteration 3 plan

Schedule for Iteration 3

Cosmos_Release_Plan

Design doc every enhancement

  • if the enhancement is really small, put in at least a paragraph and a link to the use case for QA and documentation.
  • if the enhancement is not small, the design doc needs to explain the change, anyone other than the assignee who is affected, how much work it is, any ramifications, and in general please avoid any changes to 3rd party materials other than removing a dependency on it. We have no guarantee that the change will be approved for COSMOS v1.2.

Bugzillas for this iteration

Sizing legend:

  • Low - takes 1-3 days
  • Medium - takes a week
  • High - takes more than a week

Status to be filled in by:

  • Management Enablement bugzilla status (Jason Losh)
  • RE/Build bugzilla status (Brad Beck)
  • QA bugzilla status (SAS)
  • Doc bugzilla status (No owner)
  • Legal & release review prep and status (Jason Losh)

The Status column can have one of these values:

  • COMPLETE
  • On track
  • At risk
  • Not containable
  • Defer (no longer a priority for this iteration)
  • Not started


Priority Status Project or subteam Enhancement Severity Description Blocked by (if applicable) Owner Sizing Design Doc Use Case
Medium Not started ME Enhancement Design/document SDD runtime interaction/integration with P2 Jason Losh High
Medium Not started ME 299382 Enhancement Implement simple registry to store resulting resource/change information Josh Hester High 299382