h2. COSMOS RELEASE SCHEDULE FOR 2007
+
COSMOS RELEASE SCHEDULE FOR 2007
  
 
* Iteration 1;  Code Freeze 2/28.  Iteration 1 complete March 05.  (demo)
 
* Iteration 1;  Code Freeze 2/28.  Iteration 1 complete March 05.  (demo)
 
* Iteration 2:  Complete iteration 2 by 4/16.  (need i2 plan)   
 
* Iteration 2:  Complete iteration 2 by 4/16.  (need i2 plan)   
 
* Iteration 3:  Complete iteration 3 by 5/28  (need i3 plan) to ship along with Europa.
 
* Iteration 3:  Complete iteration 3 by 5/28  (need i3 plan) to ship along with Europa.

Revision as of 15:22, 8 February 2007

COSMOS RELEASE SCHEDULE FOR 2007

  • Iteration 1; Code Freeze 2/28. Iteration 1 complete March 05. (demo)
  • Iteration 2: Complete iteration 2 by 4/16. (need i2 plan)
  • Iteration 3: Complete iteration 3 by 5/28 (need i3 plan) to ship along with Europa.