Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TPTP-AG-20080512"

(Defects to be resolved during i8 TP1/TP2)
(Defects to be deferred to future)
Line 122: Line 122:
  
 
==== Defects to be deferred to future ====
 
==== Defects to be deferred to future ====
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=216498 Perfmon (monitoring agent and statistical views) as-is component is missing documentation  
+
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=216498 Perfmon (monitoring agent and statistical views) as-is component is missing documentation]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=212706 Remove references to Perfmon and statistical views from the platform docs]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=212706 Remove references to Perfmon and statistical views from the platform docs]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=201341 Log interactions diagram is too slow on db serialized correlations]
 
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=201341 Log interactions diagram is too slow on db serialized correlations]

Revision as of 01:58, 14 May 2008

Date

  • May 12, 2008

Attendees

  • Present:
    • Paul Slauenwhite
    • Tony Wang
    • Oliver Cole
    • Alex Nan
    • Alexander Alexeev
    • Eugene Chan
    • Duwayne Morris
    • Chris Elford
    • Joanna Kubasta

Topics

  • 4.5 Deferred Enhancements and Defects.
  • Post-4.5 Discussion.

Minutes

Integrating TPTP and SAP Heap Profilers (Part 2)

  • Due to limited resources, no planned enhancements (without resources) and only defect fixing for post-4.5.
  • SAP should submit the requested enhancements.
    • We cannot commit to any enhancement work until new resources are contributed to the project.
    • The enhancement owner will assign a sizing to be used in discussing the required resources for the initiative.
  • Oliver to send an email to SAP informing them of our decisions on integrating the TPTP and SAP heap profilers.

4.5 Deferred Enhancements and Defects

Test Project

Defects to be resolved during I8 TP1/TP2

1 Covered under the Platform Project.

Defects to be deferred to Future

Monitoring Project

Defects to be resolved during i8 TP1/TP2

Defects to be deferred to future

Trace Project

Platform Project

Post-4.5 Discussion

  • Due to limited resources, no planned enhancements (without resources) and only defect fixing for post-4.5.
  • Interest in slimming/flattening the organization of the project.
    • One person would do the scheduling.
    • One person would do mentoring/policing.
    • Project Leads would not handle resource allocation and scheduling.
  • Alex will not be contributing to the project post-4.5.
  • We need to close the post-4.5 resources over the next two weeks.
    • Joanna will discuss with IBM in preparaton for the May 21 PMC call.

Action Items

  • Oliver to send an email to SAP informing them of our decisions on integrating the TPTP and SAP heap profilers.
  • Project Leads will update this WIKI page with the complete list of 4.5 deferred enhancements and defects.
  • Project Leads will review the updated list of 4.5 deferred enhancements and defects and discuss any concerns on Wednesday's PMC call.
  • Joanna will discuss post-4.5 resources with IBM in preparaton for the May 21 PMC call.
  • Committers can send topic suggestions for upcoming AG calls to the PMC mailing list.

Back to the top