Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Hudson-ci/Planning/Cross Job Summary"

m (New page: {{Hudson|pageTitle=Cross Job Summary Views}} = Requirement = This feature describes a need to visualize a summary or dashboard which gives an overview results / progress of a whole ser...)
 
m
 
Line 3: Line 3:
 
= Requirement  =
 
= Requirement  =
  
This feature describes a need to visualize a summary or dashboard which gives an overview results / progress of a whole series of related but separate jobs
+
This feature describes a need to visualize a summary or dashboard which gives an overview results / progress of a whole series of related but separate jobs. The main problem here being that currently a developer has to 
 +
 
 +
#Know that a set oif jobs are in some way related
 +
#Drill down into each job to acertain the true status of each

Latest revision as of 18:16, 4 October 2011

Hudson Continuous Integration Server
Website
Download
Community
Mailing ListForumsIRCmattermost
Issues
OpenHelp WantedBug Day
Contribute
Browse Source
Hudson-bust.png Cross Job Summary Views











Requirement

This feature describes a need to visualize a summary or dashboard which gives an overview results / progress of a whole series of related but separate jobs. The main problem here being that currently a developer has to 

  1. Know that a set oif jobs are in some way related
  2. Drill down into each job to acertain the true status of each

Back to the top