= Swordfish Sprints for Galileo =
 
 
[[Image:Swordfish_Galileo_SprintPlan.png | Swordfish Sprint Schedule]]
 
 
 
 
Swordfish is developed using the scrum method. For the Galileo release the following sprints have been scheduled in synchronization with the Galileo Milestones for the Swordfish project. The Features and Tasks for Each sprint can be accessed through the links below:
 
 
[[Swordfis_Documentation:_Galileo_Sprint1 | sprint1: 09.02.2009 – 05.03.2009]]
 
 
sprint2: 06.03.2009 – 18.03.2009 (M6)
 
 
sprint3: 19.03.2009 – 02.04.2009
 
 
sprint4: 03.04.2009 – 16.04.2009
 
 
sprint5: 17.04.2009 – 06.05.2009 (M7)
 
 
sprint6: 07.05.2009 – 20.05.2009 (RC1)
 
 
Release: 21.05.2009 – 17.06.2009 (Endgame)
 