Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "TPTP-PMC-20090513"

(New page: == Logistics == Attending: Oliver, Harm, Kathy, Chris Any objections to last summary? * no == 4.5.2.1 Discussion == Kathy provided an update. * We had to respin for 4.5.2.1 last night ...)
 
 
Line 17: Line 17:
 
* IBM thinks it will probably mean 1-2 more respins
 
* IBM thinks it will probably mean 1-2 more respins
  
Itanium transfer.
+
== 4.6 Discussion ==
* Showed documents to legal folks and have concerns
+
Oliver thinks we are about a month and a half until final Galileo drop and asks if we're on track
* IBM has some general concerns about the return clause
+
* There was general agreement that we're in okay shape.
* Some discussion between IBM and Intel about different SDV share clauses
+
  
Defects to defer
+
We discussed defects to defer out of 4.6
* Deferred out P2/P3 defects
+
* Teams already deferring out P2/P3 defects
* Now overall defect count looking better
+
* Now the overall defect count is looking better
a few more are possibles
+
** A few more fixes are possibles
* attach/detach under review
+
** The attach/detach patch under review
* heap profiling error chunrei has another fix for
+
** For the heap profiling error, chengrei has another fix for it
JVM JVMTI issue discussion
+
** For JVM JVMTI issue, the JVM team has a new version that fixes most of the issue
* JVM team has new version that fixes most of it
+
*** A new trace has been provided to JVM team for a variation of the crash and the JVM team has some ideas
* New trace provided for variation of the crash
+
* JVM team has ideas about how to fix
+
  
Solaris sparc initial port integrated
+
The Solaris/Sparc initial port has been integrated
* testing did show up a bit of testing
+
* It has undergone a fair amount of testing.
* Still trying to merge AIX code
+
* Still trying to merge AIX code and it might come in in the next few weeks.
* Might come in in the next few weeks.
+
** All changes are in platform specific codepath.
** All are in platform specific codepath.
+
  
Oliver thinks about a month and a half until final Galileo
+
Paul has a few issues on Test side but he's working thru them
* In general agreement that we're in okay shape.
+
  
Paul has a few issues but he's working thru them
+
== Misc ==
 +
Itanium platform transfer
 +
* IBM showed loaner documents to legal folks at IBM and some general discussion topics
 +
* Teams will continue to work on this.

Latest revision as of 19:07, 29 May 2009

Logistics

Attending: Oliver, Harm, Kathy, Chris

Any objections to last summary?

  • no

4.5.2.1 Discussion

Kathy provided an update.

  • We had to respin for 4.5.2.1 last night
  • Have build respun already

Regarding build transfer, IBM suggested that we only switch to new way for 4.6 and not for 4.5.2.1

  • Chris noted that Intel plans to decommission the build systems after transfer is done so we cant keep it this way forever.
  • IBM noted that this is really for current milestones (e.g., thru end of May or June)

Chris to find from Yi on whether this is okay for 4.5.2.1

  • IBM thinks it will probably mean 1-2 more respins

4.6 Discussion

Oliver thinks we are about a month and a half until final Galileo drop and asks if we're on track

  • There was general agreement that we're in okay shape.

We discussed defects to defer out of 4.6

  • Teams already deferring out P2/P3 defects
  • Now the overall defect count is looking better
    • A few more fixes are possibles
    • The attach/detach patch under review
    • For the heap profiling error, chengrei has another fix for it
    • For JVM JVMTI issue, the JVM team has a new version that fixes most of the issue
      • A new trace has been provided to JVM team for a variation of the crash and the JVM team has some ideas

The Solaris/Sparc initial port has been integrated

  • It has undergone a fair amount of testing.
  • Still trying to merge AIX code and it might come in in the next few weeks.
    • All changes are in platform specific codepath.

Paul has a few issues on Test side but he's working thru them

Misc

Itanium platform transfer

  • IBM showed loaner documents to legal folks at IBM and some general discussion topics
  • Teams will continue to work on this.

Back to the top