Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Aperi Development Status Meeting 10/30/06

Aperi Wiki Home Aperi Meetings Aperi Development Meetings

Attendees:

Brocade (John Crandall), IBM (Craig Laverone, Todd Singleton, Brian Delaire, Dave Wolfe, Chris King, Steven Lieske, Christoph Reichert, Marcus Siegmund, Hans Lin, Tom Guinane), Novell (Randy Stokes)

Minutes:

  • Project Leader Notes (Todd/Tom for Ted)
    • Contribution status:
      • Janet Campbell has asked for the revised version of our contribution that removes problematic references and third party code identified during initial review. Helen will provide her with that this morning.
      • The only thing remaining to complete is the notification to the US Encryption Regulation Office that the cryptography used in the contribution is low grade. Tom and Helen to check back with her today to see if that was completed and get out contribution status.
  • Release Lead Notes (Dave)
    • Nothing for today.
  • Status on initial contribution items:
Task Duration Start Finish
Eclipse legal Review 40 days Thu 9/7/06 Thu 10/26/06
Load code into cvs at Eclipse 1 day Fri 10/27/06 Fri 10/27/06
Contribution downloadable in Eclipse cvs 0 days Fri 10/27/06 Fri 10/27/06
Build instructions - Eclipse cvs 5 days Mon 10/30/06 Fri 11/03/06
  • Updated Schedule - updates made in the schedule.
    • New GUI schedule with Classic changes are included in this update.
  • Phase 2:
    • Design
    • Implementation
    • Test
      • Smoke Test: Build Issues
      • Hans to verify 31722 and 31936 today
      • If there are any remaining hig severity issues preventing IDVT test entry, Hans/Brian will bring to the team attention by Haloween.
    • ID
      • Chris making minor updates to documentation
    • Derby issues
  • Action Items
]-
Item Owner Target Status
Third Party Dependency Questionnaire Helen 10/31/06 Questionnaires submitted 9/6. - Eclipse has started the review. Checking with Eclipse for status and a possible target end date.
NEW: Bug clean up Dave 10/31/06 Figure out what to do with the remaining Aperi initial contribution bugs. Either fix or move to Bugzilla.
  • Other:
    • Eclipse Summit
    • SNW

Back to the top