COSMOS 1.1 Iteration6 Features

COSMOS v1.1 iteration 6 plan

Schedule for Iteration 6

Schedule for Iteration 6

Design doc every enhancement

  • if the enhancement is really small, put in at least a paragraph and a link to the use case for QA and documentation.
  • if the enhancement is not small, the design doc needs to explain the change, anyone other than the assignee who is affected, how much work it is, any ramifications, and in general please avoid any changes to 3rd party materials other than removing a dependency on it. We have no guarantee that the change will be approved for COSMOS v1.1.

Bugzillas for this iteration (Jimmy, David, Jason, Saurabh, QA, Doc)

Sizing legend:

  • Low - takes 1-3 days
  • Medium - takes a week
  • High - takes more than a week

Status to be filled in by:

  • Data Collection bugzilla status (Jimmy Mohsin)
  • Data Visualization bugzilla status (Jimmy Mohsin)
  • Resource Modeling bugzilla status (David Whiteman)
  • Management Enablement bugzilla status (Jason Losh)
  • RE/Build bugzilla status (Saurabh Dravid)
  • QA bugzilla status (No owner)
  • Doc bugzilla status (No owner)
  • Legal & release review prep and status (Jason Losh)

The Status column can have one of these values:

  • COMPLETE
  • On track
  • At risk
  • Not containable
  • Defer (no longer a priority for this iteration)
  • Not started


Priority Status Project or subteam Enhancement Severity Description Blocked by (if applicable) Owner Sizing Design Doc Use Case
Medium COMPLETE Management Enablement 282059 Enhancement Need to finalize format to specify translationKeys and their order N/A Jason Losh Medium
Medium COMPLETE Management Enablement 281219 Enhancement Add in code to handle localization files to CLI 282059 Josh Hester Medium 281219
Medium Defer Management Enablement 281282 Enhancement Resolve ResourcePropertyType variables N/A Jeff Hamm Medium
Low Defer RE/Build 281276 Bug Remove obsolete profile project and add new profile project N/A Saurabh Dravid Low N/A N/A
High Not Started Management Enablement 281288 Enhancement Decompose operation handler into discreet operations N/A Mark Mccraw High Needed Needed
Medium COMPLETE Management Enablement 281881 Enhancement Create osgi bundles for implementing logging in the runtime N/A Jeff Hamm High N/A N/A
Medium Defer Management Enablement 282024 Enhancement Need to honor priority attribute for AlternateTypes and ConstraintTypes N/A Jeff Hamm Medium N/A N/A